Search
  • WELCOME
  • ABOUT BBP
    • WHY WORK WITH BBP
    • MEET OUR TEAM
    • BBP Partners
    • FREQUENTLY ASKED QUESTIONS
  • PROGRAMS
    • MASH
    • NEW CONSTRUCTION
    • DEMAND RESPONSE
    • New District Energy
  • RESOURCES
    • INCENTIVES
    • LOANS
    • ENERGY MANAGEMENT FIRMS
    • ENERGY MODELLING CONSULTANTS
    • DOWNLOADABLE APPLICATIONS
    • Green Buildings Initiatives
  • MEDIA
    • NEWS & EVENTS
    • TESTIMONIALS
    • CASE STUDIES
    • BBP Newsletters
    • Video
    • Presentations
  • Blog
  • CONTACT US
Case Studies
Check out our case studies below to learn more about projects like yours. Search with our map or browse projects using the slider to get an in depth look at selected projects in each sector.
GO BACK

Toronto Catholic District School Board
Tags: Academic

Project Address

Toronto Catholic District School Board
80 Sheppard Avenue East
Toronto, ON M2N 6E8

Key Contact

Mary Walker,
Communications Supervisor

Main Building Contacts:
Rose MacDonald, Supervisor
TCDSB Central Services

Project Background

Toronto Catholic District School Board (TCDSB) governs 208 schools in the Toronto area including 30 secondary and 178 elementary schools. In total there are 15,365 full-time equivalent teachers and 94,936 students enrolled in TCDSB schools.

TCDSB wanted to reduce operating costs and become a more energy efficient school board by making environmental changes in various schools. And with many of the schools dating back to the 1950’s, many of the existing technologies and infrastructures were old and out of date.

In 2007, a lighting audit was conducted by ALD Architectural Lighting Design who designed an implementation plan to upgrade the existing lighting. TCDSB reached out to the City of Toronto’s Better Buildings Partnership to access information and resources to support their energy efficient lighting retrofits.

Challenges

With all schools fully operational, TCDSB wanted to ensure students’ schedules and environments were not disturbed. With these challenges in mind, TCDSB sought to reduce the carbon footprint of its combined campuses and minimize energy operating costs by upgrading their lighting systems.

“By working together with the BBP to upgrade parts of our lighting systems in multiple schools and portables, we expect to see savings of about 25% annually, lowering the payback period to just 3.5 years.” Rose MacDonald, Supervisor TCDSB Central Services

Solution

Toronto’s Better Buildings Partnership was involved in supporting the TCDSB to access the energy savings incentives that the program offers, enabling the school board to do more with its budget and improve the lighting in more schools. The existing lighting consisted of T12 linear fluorescents, incandescent and halogen lamps. The aim of the retrofit plan was to upgrade to an energy efficient lighting system including T8 linear fluorescents lamps complete with electronic ballasts, compact fluorescents and high pressure sodium lighting. The projects implemented include:

  • Replacement of T12 with T8, and incandescent with CFL in seven schools
  • Replacement of T12 with T8 in one school and 139 portable classrooms
  • Replacement of T12 with T8, incandescent with CFL, and Halogen with HPS in one additional school

“By working together with the BBP to upgrade parts of our lighting systems in multiple schools and portables, we expect to see savings of about 25% annually, lowering he payback period to just 3.5 years”, said Rose MacDonald, Supervisor, TCDSB Central Services. “Not to mention, we’ve reduced our environmental footprint by 750,000Kg of CO2 annually – equivalent to taking 150 cars off the road.”

Results

The energy efficient upgrades to 264,536 Sqft of TCDSB facilities resulted in 84,535 kWh of annual electricity savings and an annual greenhouse gas savings of 562,323 kg of CO2. These reductions are expected to provide an annual cost savings of $58,453 with a payback period of 3.86 years. These savings were accomplished with the support of a $68,927.00 incentive payment from the Better Buildings Partnership.

All measures were accomplished without any disruption to classes by ensuring all work was conducted in the evenings.

Project Snapshot

  • Project cost:$294,500
  • Annual electricity savings:584,535 kWh
  • Annual cost savings:$58,453
  • Annual CO2 savings:562,323 kg of CO2
  • BBP Incentives received:$68,927

About the City of Toronto

Toronto is Canada’s largest city and sixth largest government, and home to a diverse population of about 2.6 million people. It is the economic engine of Canada and one of the greenest and most creative cities in North America. Toronto has won numerous awards for quality, innovation and efficiency in delivering public services. Toronto’s government is dedicated to prosperity, opportunity and livability for all its residents.

For more information please contact:

Better Buildings Partnership
Tel: 416-392-1500
bbp@toronto.ca

Click here to download this case study in a PDF format

    News & Events
    April 15, 2013
    Case Studies: UHN
    January 07, 2013
    New Blog Post: Environmental Attributes – Trading Carbon: Not So Simple
    Quicklinks
    1. BBP incentives
    2. Energy Management Firms
    3. BBP benefits
    4. FAQs
    Results
    As of December 2012
    Projects completed:
    Space retrofitted:
    Jobs created:
    Economic impact:
    Annual cost savings:
    CO2 cuml. reduction:
    1,972
    440 Million Sq. Ft.
    29,000 Person Years
    $655 Million
    $59 Million
    444 Thousand Tonnes
    Testimonials
    "Green buildings provide an environment for the long term benefit of everyone. Not only do they help save energy costs, but Green buildings will help reduce Greenhouse Gas emissions..."
    Rambod Nasrin, Tridel

    bot_more_testimonials
Log-in to your account
Don't have an account? Sign up

Your email address:
Your password:

Forgot your password? Click here. log-in

 

 

Forgot your password?
Your email address:

Get New Password

 

 

Register
 
Register with BBP to get more detailed information about your sector.
 
MULTI-FAMILY
 

A multi-unit residential building with over 6 units and over 25,000 square feet - All condominiums, co-operatives, rental units and social housing are eligible

MASH
 

An institutional building of any size - All existing MASH (Municipal, Academic, Social Services and Healthcare) facilities are eligible

New Construction
  A new building to be constructed. All institutional, commercial, multi-residential and industrial buildings are eligible.
 
 
What is the building's approximate square footage?
 
0 - 50,000 square ft 50,000 - 150,000 square ft 150,000 square ft +
 
 
What is the building's postal code (Required)
 
Your email address:
Password:
Re-type password:

register


Privacy and Security Statement
Copyright © 2009 Better Buildings Partnership