Search
  • WELCOME
  • ABOUT BBP
    • WHY WORK WITH BBP
    • MEET OUR TEAM
    • BBP Partners
    • FREQUENTLY ASKED QUESTIONS
  • PROGRAMS
    • MASH
    • NEW CONSTRUCTION
    • DEMAND RESPONSE
  • RESOURCES
    • INCENTIVES
    • INTEREST FREE LOANS
    • ENERGY MANAGEMENT FIRMS
    • ENERGY MODELLING CONSULTANTS
    • DOWNLOADABLE APPLICATIONS
    • Green Buildings Initiatives
  • MEDIA
    • NEWS & EVENTS
    • TESTIMONIALS
    • CASE STUDIES
    • BBP Newsletters
  • CONTACT US
Case Studies
Check out our case studies below to learn more about projects like yours. Search with our map or browse projects using the slider to get an in depth look at selected projects in each sector.
GO BACK

Broadway
Tags: MEER

Project Address

Broadway Condominiums
153 and 155 Beecroft Ave.,
Toronto

Key Contact

David Blois,
Senior Property Manager

Project Background

Constructed in 2004, Broadway Condominiums is a 750,000 square foot high rise residential condo complex that consists of two buildings: Broadway One and Broadway Two.

Following energy audits conducted in January 2008, Broadway Condominiums observed several opportunities for energy efficient improvements to its buildings that would result in substantial cost savings and, ultimately enhance the homes of the hundreds of residents they serve. Broadway Condominiums acted on the opportunity to make energy efficiency improvements to its ventilation system.

Challenges

Several complaints from residents about too much airflow from fresh air vents in common hallways and very high gas and electrical bills prompted questions about the operational efficiency of the complex. Operational costs, the buildings’ efficiency, maintenance costs, and environmental sensitivities motivated the condo corporation to undergo energy efficiency improvements.

Based on the number of residents (nearly 2,000) and number of suites in the complex (656), the existing ventilation system was oversized and using more energy than necessary. By considering the three make-up air (MUA) units in the complex – the upper units on the rooftops of each building and the lower unit in the shared parking garage – the amount of delivered air could be reduced, ultimately reducing operational costs. Also, the expected costs to maintain the ventilation system in the shared underground garage were looming.

Solution and Results

Broadway Condominiums teamed up with the City of Toronto’s Better Buildings Partnership (BBP) to evaluate the incentives available to offset the costs for their energy conservation efforts for the complex. The MUA unit in the shared underground parking garage and both buildings’ rooftop MUA units have been modified by installing Variable Frequency Drives which reduce the amount of total delivered air, and therefore reducing the amount of energy used to ventilate the buildings. The energy efficiency ventilation retrofits produced a savings of 304,307 kWh in electricity annually. As a result, Broadway Condominiums was awarded over $21,000 in BBP incentives for the successful  ompletion of these three energy efficiency ventilation retrofits.

“The approximate two year projected payback period for lighting retrofits and variable frequency drive installations at this large residential condominium site should have resulted in early approvals, but the very substantial incentives available through the Better Building Partnership solidified the Board’s environmental and fiscal resolve to move forward. The contractors for the projects assisted greatly with the preparation and  ubmission of the incentive documentation and I was extremely impressed with how efficiently and quickly the applications were then looked after by the Better Building Partnership staff.”
David Blois, Sr. Property Manager, Wilson Blanchard Management Inc.

Project Snapshot

Broadway One
(153 Beecroft Ave.)

  • Project cost:$39,700.51
  • Annual electricity savings:150,195 kWh
  • Annual cost savings:$15,019.50
  • Annual CO2 savings:144.49 tonnes CO2
  • BBP Incentives received:$ 10,513.66

Broadway Two
(155 Beecroft Ave.)

  • Project cost: $35,730.46
  • Annual electricity savings:154,112 kWh
  • Annual cost savings:$15,411.20
  • Annual CO2 savings:148.26 tonnes CO2
  • BBP Incentives received:$ 10,787.85

About the City of Toronto

Toronto is Canada’s largest city and sixth largest government, and home to a diverse population of about 2.6 million people. It is the economic engine of Canada and one of the greenest and most creative cities in North America. Toronto has won numerous awards for quality, innovation and efficiency in delivering public services. Toronto’s government is dedicated to prosperity, opportunity and livability for all its residents.

For more information please contact:

Better Buildings Partnership
Tel: 416-392-1500
bbp@toronto.ca

Click here to download this case study in a PDF format

    News & Events
    May 14, 2012
    saveONenergy Program Incentives & Tutorials
    May 28, 2012
    Energy Matters Summit
    Quicklinks
    1. BBP incentives
    2. Energy Management Firms
    3. BBP benefits
    4. BBP Procedures Manual
    5. FAQs
    Results
    As of April 02, 2012
    Projects completed:
    Space retrofitted:
    Jobs created:
    Annual cost savings:
    CO2 reduction:
    1,896
    370 Million Sq. Ft.
    80,142 PY
    $56.2 Million
    0.45 Million Tonnes
    Testimonials
    "Green buildings provide an environment for the long term benefit of everyone. Not only do they help save energy costs, but Green buildings will help reduce Greenhouse Gas emissions..."
    Rambod Nasrin, Tridel

    bot_more_testimonials
Log-in to your account
Don't have an account? Sign up

Your email address:
Your password:

Forgot your password? Click here. log-in

 

 

Forgot your password?
Your email address:

Get New Password

 

 

Register
 
Register with BBP to get more detailed information about your sector.
 
MULTI-FAMILY
 

A multi-unit residential building with over 6 units and over 25,000 square feet - All condominiums, co-operatives, rental units and social housing are eligible

MASH
 

An institutional building of any size - All existing MASH (Municipal, Academic, Social Services and Healthcare) facilities are eligible

New Construction
  A new building to be constructed. All institutional, commercial, multi-residential and industrial buildings are eligible.
 
 
What is the building's approximate square footage?
 
0 - 50,000 square ft 50,000 - 150,000 square ft 150,000 square ft +
 
 
What is the building's postal code (Required)
 
Your email address:
Password:
Re-type password:

register


Privacy and Security Statement
Copyright © 2009 Better Buildings Partnership