Search
  • WELCOME
  • ABOUT BBP
    • WHY WORK WITH BBP
    • MEET OUR TEAM
    • BBP Partners
    • FREQUENTLY ASKED QUESTIONS
  • PROGRAMS
    • MASH
    • NEW CONSTRUCTION
  • RESOURCES
    • INCENTIVES
    • INTEREST FREE LOANS
    • ENERGY MANAGEMENT FIRMS
    • ENERGY MODELLING CONSULTANTS
    • DOWNLOADABLE APPLICATIONS
    • Green Buildings Initiatives
  • MEDIA
    • NEWS & EVENTS
    • TESTIMONIALS
    • CASE STUDIES
    • BBP Newsletters
  • CONTACT US
Case Studies
Check out our case studies below to learn more about projects like yours. Search with our map or browse projects using the slider to get an in depth look at selected projects in each sector.
GO BACK

Toronto East General Hospital
Tags: Healthcare, MASH

Project Address

825 Coxwell Avenue. Toronto ON

Key Contact

Project Manager: Betty Best, Toronto East General Hospital

Project Background

Toronto East General Hospital (TEGH) is a large urban community teaching hospital serving a diverse, multi-cultural population of 400,000, representing over 45 cultural and linguistic groups in East Toronto. Home to 2,600 employees, and 400 physicians and midwives, TEGH annually admits 20,000 acute care inpatients, delivers 3,500 babies, has over 60,000 emergency visits and provides service to over 220,000 outpatients.

Originally built in 1929, TEGH has grown from a 110-bed general hospital to a 515-bed full service healthcare facility. After 80 years of expansion, TEGH was ready for an infrastructure renewal program that would significantly reduce energy and water consumption.

In 2006, the TEGH partnered with Honeywell to begin an extensive energy savings and facility renewal program, centered on infrastructure upgrades that would reduce its carbon footprint, resulting in substantial cost savings.

Desired Outcomes

As a publicly funded institution, TEGH must manage its resources carefully to ensure that its facilities are operating as efficiently as possible. Faced with an aging infrastructure, and utility prices trending higher, (with the possibility of significant increases at any time) there is an increased pressure on institutions to reduce the risk of unanticipated future costs.

 

“We started out with the goal of improving our facilities while being fiscally and environmentally responsible,” said Rob Devitt, President and CEO, Toronto East General Hospital.

With the help of Honeywell, TEGH wanted to develop a program that would use the energy cost savings to pay for the work, creating a self-funded renewal program with minimal risk.

Solution and Results

TEGH developed a $9.5-million (CAD) energy savings and facility renewal program, centered on infrastructure upgrades that will help the hospital reduce energy and water consumption. Toronto’s Better Buildings Partnership and Toronto Water were consulted to potentially access the energy and water savings incentives that the programs offer, enabling the hospital to do more with its budget. The projects implemented included:

  • Power quality improvements
  • Lighting redesign
  • Variable speed drives on cooling towers
  • Improved building envelope
  • Replacement of leaky steam traps
  • Chiller plant upgrade
  • Replacement of plumbing fixtures
  • Replacement of medical vacuum pumps
  • New boiler draft controls
  • Installation of a new building automation system (BAS)

“The program is going to save a substantial amount of energy and water annually — a major achievement for the hospital,” adds Devitt. “The program is expected to trim utility bills by $880,000 per year while creating a better, more modern environment for our patients, physicians and staff. In addition, we’ve reduced our environmental footprint by nearly 3,000 tonnes of CO2 annually – that’s the equivalent of taking 475 cars off the road.”

The energy efficient upgrades to the hospital’s facilities resulted in 3,108,335 kWh of annual electricity savings, and an annual greenhouse gas savings of nearly 3,000 tonnes of CO2. By replacing plumbing fixtures and medical vacuum pumps, as well as eliminating city water waste in the cooling equipment, the hospital will save 114,471 m3 of water annually; enough water to fill about 40 Olympic-size swimming pools.

In reducing annual utility costs and utilizing financial incentives of $241,901 from the Better Buildings Partnership, $130,538 from Toronto Water and $47,000 from Enbridge, TEGH has succeeded in lowering the payback period to just 9.5 years, reaching a new standard in fiscal and environmental responsibility.

Project Snapshot

  • Project cost: $9.5 Million
  • Annual electricity savings: 3,108,335 kWh
  • Annual cost savings: $880,000
  • Annual CO2 savings: nearly 3,000 tonnes of CO2
  • Annual water savings: 114,471 m3
  • Incentives received: BBP ($241,901); Toronto Water ($130,538); Enbridge ($47,000)
  • Payback period: less than 10 years

About the City of Toronto

Toronto is Canada’s largest city and sixth largest government, and home to a diverse population of about 2.6 million people. It is the economic engine of Canada and one of the greenest and most creative cities in North America. Toronto has won numerous awards for quality, innovation and efficiency in delivering public services. Toronto’s government is dedicated to prosperity, opportunity and livability for all its residents.

For more information please contact:

Better Buildings Partnership
Tel: 416-392-1500
bbp@toronto.ca

Click here to download this case study in a PDF format

    Recent Case Studies
     
    Toronto Catholic District School Board

    Tags: Academic
     
     
    Tyndale

    Tags: Academic
     
     
    Victoria University

    Tags: Academic
     
    News & Events
    February 14, 2012
    Toronto Hydro – saveONenergy Events
    October 28, 2011
    Sustainable Energy Funds
    Quicklinks
    1. BBP incentives
    2. Energy Management Firms
    3. BBP benefits
    4. BBP Procedures Manual
    5. FAQs
    Results
    As of February 01, 2012
    Projects completed:
    Space retrofitted:
    Jobs created:
    Annual cost savings:
    CO2 reduction:
    1,892
    365 Million Sq. Ft.
    85,664 PY
    $55.8 Million
    0.41 Million Tonnes
    Testimonials
    "Green buildings provide an environment for the long term benefit of everyone. Not only do they help save energy costs, but Green buildings will help reduce Greenhouse Gas emissions..."
    Rambod Nasrin, Tridel

    bot_more_testimonials
Log-in to your account
Don't have an account? Sign up

Your email address:
Your password:

Forgot your password? Click here. log-in

 

 

Forgot your password?
Your email address:

Get New Password

 

 

Register
 
Register with BBP to get more detailed information about your sector.
 
MULTI-FAMILY
 

A multi-unit residential building with over 6 units and over 25,000 square feet - All condominiums, co-operatives, rental units and social housing are eligible

MASH
 

An institutional building of any size - All existing MASH (Municipal, Academic, Social Services and Healthcare) facilities are eligible

New Construction
  A new building to be constructed. All institutional, commercial, multi-residential and industrial buildings are eligible.
 
 
What is the building's approximate square footage?
 
0 - 50,000 square ft 50,000 - 150,000 square ft 150,000 square ft +
 
 
What is the building's postal code (Required)
 
Your email address:
Password:
Re-type password:

register


Privacy and Security Statement
Copyright © 2009 Better Buildings Partnership