Search
  • WELCOME
  • ABOUT BBP
    • WHY WORK WITH BBP
    • MEET OUR TEAM
    • BBP Partners
    • FREQUENTLY ASKED QUESTIONS
  • PROGRAMS
    • MASH
    • NEW CONSTRUCTION
    • DEMAND RESPONSE
    • New District Energy
  • RESOURCES
    • INCENTIVES
    • LOANS
    • ENERGY MANAGEMENT FIRMS
    • ENERGY MODELLING CONSULTANTS
    • DOWNLOADABLE APPLICATIONS
    • Green Buildings Initiatives
  • MEDIA
    • NEWS & EVENTS
    • TESTIMONIALS
    • CASE STUDIES
    • BBP Newsletters
    • Video
    • Presentations
  • Blog
  • CONTACT US
Case Studies
Check out our case studies below to learn more about projects like yours. Search with our map or browse projects using the slider to get an in depth look at selected projects in each sector.
GO BACK

Centennial College
Tags: Academic, MASH

Project Addresses

Centre for Creative Communications
951 Carlaw Avenue, Toronto, ON

Astonbee Campus
75 Astonbee Rd. Toronto, ON

Progress Campus
941 Progress Avenue, Toronto, ON

HP Science and Technology Centre
755 Morningside Avenue, Toronto, ON

Key Contacts

Property Manager: Tyrone Gangoo, Manager, Plant Services, Facilities & Services, Centennial College

Project Background

Toronto’s Centennial College encompasses four campuses and five satellite locations, representing approximately 1.082 million square feet. Home to some 12,500 full-time and 25,000 part-time students, the college operates 14 hours a day, 6 days per week, for most of the year.

With the majority of its facilities built in the 1970’s and 1980’s, Centennial College was well positioned to reduce their energy costs and carbon footprint through energy efficient retrofits.

Following an energy audit conducted in 2004 by Toronto Hydro Energy Services Inc, several opportunities for improvement were presented that would result in substantial cost savings, including power factor correction and an energy efficient lighting retrofit.

Desired Outcomes

As a publicly funded institution, Centennial College must manage its resources carefully to ensure that facilities are operating as efficiently and as environmentally responsible as possible. With energy prices trending higher and the possibility of significant increases at any time, there is an increased pressure on institutions to reduce the risk of unanticipated future costs. With these things in mind, and a need to not disrupt classes in the process, Centennial College sought to reduce the carbon footprint of its sites and minimize energy operating costs, through energy efficiency upgrades.

Solution and Results

Centennial College evaluated several energy efficiency projects on four campuses, including the cost involved and the time it would take to achieve payback on investment. Toronto’s Better Buildings Partnership was consulted to potentially access the energy savings incentives that the program offers, enabling the college to do more with its budget. The projects implemented included:

  • Retrofitting existing T-12 lighting to more energy efficient T-8 technology without sacrificing lighting levels, replacing 4,278 fixtures (mostly HID and incandescent) with higher efficiency alternative fixtures in three campuses and one residence.
  • Introduced ultrasonic occupancy sensors at three sites.
  • At 941 Progress Avenue Campus, converted the fan system to variable frequency drives to better match fan operation to air quality and comfort needs, and replaced the electric hot water heater with a high-efficiency natural gas boiler.
  • Fine-tuned existing Building Automation Systems to optimize efficiency of new measures.
  • Installed capacitor banks to improve power factor at all buildings.

As Tyrone Gangoo, Manager, Plant Services, Facilities & Services, Centennial College points out, “We have an annual energy budget of approximately $2 million and we expect to see savings of about 10% annually from all the implemented improvements – lowering the payback period to just 3.1 years. In addition, we’ve reduced our environmental footprint by 1,420 tonnes of CO2 annually – that’s the equivalent of taking 284 cars off the road.”

The energy efficient upgrades to Centennial College’s facilities resulted in 1,433,608 kWh of annual electricity savings, 19,598 m3 of annual natural gas savings, and an annual greenhouse gas savings of 1,420 tonnes of CO2. These reductions translate into an annual cost savings of $196,055. The payback period of 3.1 years was accomplished with the assistance of a $129,201 incentive received from the Better Buildings Partnership and a $11,951 incentive from Enbridge.

 

All measures were accomplished without any disruption in classes, mainly by taking advantage of summer break. Already the retrofit to newer, more efficient T-8 technology and the introduction of occupancy sensors to better manage lighting use are delivering cost savings as promised.

Project Snapshot

  • Project cost: $748,594
  • Annual electricity savings: 1,433,608 kWh
  • Annual cost savings: $196,055
  • Annual natural gas savings: 19,598 m3
  • Annual CO2 savings: 1,420 tonnes
  • Incentives received: BBP ($129,201) and Enbridge ($11,951)
  • Payback period: 3.1 years

About the City of Toronto

Toronto is Canada’s largest city and sixth largest government, and home to a diverse population of about 2.6 million people. It is the economic engine of Canada and one of the greenest and most creative cities in North America. Toronto has won numerous awards for quality, innovation and efficiency in delivering public services. Toronto’s government is dedicated to prosperity, opportunity and livability for all its residents.

For more information please contact:

Better Buildings Partnership
Tel: 416-392-1500
bbp@toronto.ca

Click here to download this case study in a PDF format

    News & Events
    April 15, 2013
    Case Studies: UHN
    January 07, 2013
    New Blog Post: Environmental Attributes – Trading Carbon: Not So Simple
    Quicklinks
    1. BBP incentives
    2. Energy Management Firms
    3. BBP benefits
    4. FAQs
    Results
    As of December 2012
    Projects completed:
    Space retrofitted:
    Jobs created:
    Economic impact:
    Annual cost savings:
    CO2 cuml. reduction:
    1,972
    440 Million Sq. Ft.
    29,000 Person Years
    $655 Million
    $59 Million
    444 Thousand Tonnes
    Testimonials
    "Green buildings provide an environment for the long term benefit of everyone. Not only do they help save energy costs, but Green buildings will help reduce Greenhouse Gas emissions..."
    Rambod Nasrin, Tridel

    bot_more_testimonials
Log-in to your account
Don't have an account? Sign up

Your email address:
Your password:

Forgot your password? Click here. log-in

 

 

Forgot your password?
Your email address:

Get New Password

 

 

Register
 
Register with BBP to get more detailed information about your sector.
 
MULTI-FAMILY
 

A multi-unit residential building with over 6 units and over 25,000 square feet - All condominiums, co-operatives, rental units and social housing are eligible

MASH
 

An institutional building of any size - All existing MASH (Municipal, Academic, Social Services and Healthcare) facilities are eligible

New Construction
  A new building to be constructed. All institutional, commercial, multi-residential and industrial buildings are eligible.
 
 
What is the building's approximate square footage?
 
0 - 50,000 square ft 50,000 - 150,000 square ft 150,000 square ft +
 
 
What is the building's postal code (Required)
 
Your email address:
Password:
Re-type password:

register


Privacy and Security Statement